Leinster · Ireland
Website redesign and modernisation in Naas
The most common way a redesign goes wrong is not the design. It is that the new site ships with new URLs, no redirect map, and traffic that took four years to build disappears in a fortnight. Preventing that is a checklist, not a talent, and it is included here rather than sold as an extra. For Naas businesses, quoted in EUR from $120, typically live in 5 days.
What website redesign and modernisation includes for a Naas business
Fixed scope, agreed in writing before development starts. From $120, typically live in 5 days.
- Full crawl of the existing site before anything changes, so nothing is lost by accident
- A URL-by-URL redirect map, in a single hop, tested before launch and again after
- Modernised responsive design built mobile-first, on the content you already rank for
- Content migration with headings, internal links and metadata preserved deliberately rather than by luck
- Core Web Vitals brought inside the thresholds during the rebuild — images, fonts and render path
- Structured data rebuilt to match the new page types
- Post-launch indexation check: Search Console coverage, sitemap resubmitted, 404s monitored
- 30 days of snag fixes after go-live
The terms for a Irish client
| Starting price | From $120, quoted and invoiced in EUR |
|---|---|
| Typical timeline | 5 days once content is supplied |
| Tax position | VAT at 23%, with my invoices reverse-charged to you as the recipient |
| Data protection | the EU GDPR, supervised by the Irish Data Protection Commission — resolved by a pre-signed DPA incorporating the EU Standard Contractual Clauses |
| Payment rails available | Stripe, SEPA Direct Debit, and Revolut Business for smaller recurring plans |
| My day in Naas time | 05:00–14:00 — about 5 hours of overlap |
Why this matters for Ireland specifically
Ireland is small enough that a niche site can own its category nationally rather than fighting city by city, which changes the keyword strategy completely — I build Irish sites for national reach first, county second.
What actually ships when a Naas project goes live
A handover for a Naas client is not a link and a login. It is the repository, the hosting account in your name, the domain registered to you, the payment provider account under your business, and a written record of every credential as it was created rather than dumped in one email at the end.
The test I apply is uncomfortable but correct: if I disappeared tomorrow, could another developer pick this up on Monday without calling me? If the answer is no, the handover is not finished. That standard is why the documentation takes a day I do not bill separately — it is part of the build, not an upsell.
Education and training providers in Naas
Course pages are the whole site. Each needs the outcome, the duration, the price, the prerequisites and the next start date visible without scrolling — and each needs to be its own indexable URL, because people search for the course, never for a training provider they have not heard of.
The recurring failure is a single "Courses" page listing twenty courses. It ranks for nothing because it is specifically about nothing. Twenty pages, each genuinely about one course, is more work and is the difference between a site that recruits and a brochure that sits there.
The contact form that silently fails
The most expensive bug on a small business website makes no noise at all. A form posts, shows a thank-you message, and the email never arrives — usually because the host's mail function is unauthenticated and the receiving server drops it without a bounce. The business concludes demand fell.
The fix is authenticated SMTP with SPF, DKIM and DMARC configured on the sending domain, plus a database write so a submission survives even when delivery fails. If you are unsure whether your Naas site has this problem, submit your own form from a phone on mobile data and see what actually arrives.
What I am not claiming about Naas
- I have no office, postal address or phone number in Naas
- I cannot meet you in person, and if that is a requirement you should hire locally
- I am not claiming existing clients in Naas specifically — my live work is listed on the work page and you can check it
- Nothing on this page is a guarantee of search rankings, which no developer can honestly offer
Website redesign and modernisation in Naas — common questions
- How long does a Naas project actually take?
- Three days for a business site, seven for a store, ten for a custom application. That holds because the process is fixed rather than improvised and because your content exists on day one. What stretches a build is almost never the code — it is waiting for copy, logos and photographs, so those are requested before the clock starts.
- What payment methods can my Naas checkout accept?
- For Ireland: Stripe, SEPA Direct Debit, and Revolut Business for smaller recurring plans. The right combination depends on your average basket and your customers, and picking wrong is expensive — the payment method a buyer expects but cannot find is one of the most common reasons a checkout is abandoned at the final step.
- How do you handle our customers' data under EU GDPR?
- Your customer data is governed by the EU GDPR, supervised by the Irish Data Protection Commission, and sending it to a developer in Pakistan is a restricted transfer. That is resolved by a pre-signed DPA incorporating the EU Standard Contractual Clauses, published on this site and pre-signed before you send an enquiry — not drafted after you ask about it.
- Who owns the website when it is finished?
- You do, completely. The domain is registered in your name, hosting sits in your account, the code lives in a repository you control, and any payment provider account is opened in your business name. Credentials are handed to you as they are created rather than at the end, so you are never locked out of your own site.
- Will the site actually rank in Naas search results?
- The build handles what is technically controllable: crawlable HTML, correct headings, structured data, fast pages, a clean sitemap and Search Console set up on day one. Ranking also depends on your competitors, your domain's age and the links pointing at you, which no developer controls. Anyone guaranteeing a position is guessing or lying.
- Do you provide ongoing maintenance after launch?
- Thirty days of snag fixes are included after launch at no extra cost — anything that does not work as specified gets fixed. Beyond that there are monthly plans for updates, backups, monitoring and small changes. They are optional and cancellable; a site handed over properly does not require a retainer to keep running.
- Can you fix my existing site rather than rebuild it?
- Often, yes, and it is usually the cheaper answer. Speed problems, a broken mobile layout, a form that silently fails or missing structured data are all fixable on the site you already have. I will tell you which of the two you need after looking, and a rebuild only gets recommended when the fix would cost more than starting again.
Related pages
Other services in Naas
Website redesign and modernisation in nearby Leinster towns
- Website redesign and modernisation Tallaght
- Website redesign and modernisation Kilkenny
- Website redesign and modernisation Portlaoise
The full service detail — process, deliverables, what is excluded and the FAQ — is on the main website redesign and modernisation page. Everything I build for Naas is on the Naas page, and every town in Ireland is on the Ireland coverage page.
Website redesign and modernisation in Naas — get a fixed quote
Send the brief and you get a reply within one business day, priced in EUR from $120. If website redesign and modernisation is not what your project actually needs, I will say so.
- Response
- Replies within 1 business day
- Hours
- Mon–Fri, 09:00–18:00 PKT — overlaps 05:00–14:00 UK, 00:00–09:00 US Eastern
- Booking
- Booking projects from October 2026